Email: [email protected]

Tel: +86-379-60866465

Home

Product

Case

News

About us

Contact us

Cases
G25 Changshen Expressway (Deqing to Fuyang )
Case introduction
G25 Changshen Expressway (Deqing to Fuyang ) with a total length of 62.715 km.The main project line adopts two-way and six-lane expressway standard in the "Technical Standards for Highway Engineering" (JTG B01-2014), the design speed is 100km/h, the standard width of the roadbed is 33.5m; the interconnection line adopts the standard of the secondary road, and the design speed is 60 km/h, subgrade width is 12m.
Equipment configuration
Cases
Contact us
Please contact us if you have any question.
+86-379-60866465
online service
Leave Us A Message

Want To Discuss About Your Machine Needs?

CONTACT US
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.
Want To Discuss About Your Machine Needs?
Contact us
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.